Municipal utilities (Stadtwerke) and regional suppliers in Germany often combine several roles: energy supplier, grid operator and metering point operator. Each role comes with its own rules, and since 2024 several of them changed at once. This post looks at what software around a billing core has to do under those rules, and what a sensible first project could look like. Everything below rests on the public sources listed at the end.
Which rules create software work for a Stadtwerk?
Four sets of rules are visible in everyday processes, according to the sources we reviewed.
Controllable consumption devices. § 14a EnWG covers, among others, heat pumps, non-public charging points for electric vehicles and electricity storage. The Bundesnetzagentur states that since 1 January 2024 such devices with more than 4.2 kW connection capacity must be controllable, that grid operators may no longer refuse or delay a connection only because of possible local overload, and that new devices must be reported to the grid operator before commissioning. Its decision BK6-22-300 dates from 27 November 2023. Reduced grid fees are offered in modules, and the third module, time-variable grid fees, had to be offered from April 2025.
Online notifications to the grid operator. Under § 19 of the Niederspannungsanschlussverordnung (NAV), charging devices for electric vehicles must be reported to the grid operator before commissioning. Above a combined rating of 12 kVA per installation the operator must also agree, and it must respond within two months of the notification. Since 1 January 2024 the grid operator has to make these notifications possible on its website, in formats agreed among grid operators.
Smart meters. The Bundesnetzagentur states that installation of intelligent metering systems is mandatory for generation plants above 7 kW, for consumers above 6,000 kWh annual consumption and for § 14a cases (§ 29 MsbG), and that the basic metering point operators carry the obligation (§ 45 MsbG). § 45(1) MsbG sets the quotas group by group. For consumers with an annual consumption of more than 6,000 and up to 100,000 kWh and for controllable consumption devices under § 14a EnWG (no. 4), equipping had to begin by 1 January 2025, with at least 20 percent of all metering points to be equipped done by 31 December 2025. For every group the law sets the same final date: by 31 December 2032, at least 90 percent of all metering points to be equipped (for generation plants: of the total installed capacity). Consumers above 100,000 kWh a year follow a later schedule that begins in 2028. On 21 September 2026 the agency reported that at 30 June 2026, 26.1 percent of the mandatory cases with a consumption of 6,000 to 100,000 kWh, including controllable § 14a installations, were equipped. It also said it had opened supervisory proceedings since March 2026 against 434 companies that did not meet the 20 percent quota.
Market communication and IT security. The Bundesnetzagentur decided that electronic market communication for electricity runs exclusively over the AS4 protocol, with e-mail under S/MIME no longer allowed from 1 April 2024, and that a service provider's delay does not release a company from that duty. For IT security, § 5c EnWG obliges grid operators to protect the systems needed for safe grid operation, and the catalogue the Bundesnetzagentur sets must cover topics such as risk analysis, supply chain security, procurement, access control and multi-factor authentication.
What follows for a custom software project?
Three observations follow from the rules above. They are our reading of the sources, not a statement about how your utility works.
First, the rules create many small, structured exchanges between customers, installers, the utility and its metering partners. A portal or request tracker that collects complete notifications once, shows their status and hands them to existing systems addresses that. It does not touch billing or market communication.
Second, anything that touches market communication or metering data has certification, protocol and ownership questions that are not software-only. Whether your utility runs these itself, through a service provider or through a partner is something you know and we do not.
Third, § 5c EnWG names procurement as part of IT security. A supplier of custom software should therefore expect questions about access control, authentication and supply chain, and should answer them in writing.
What could a first project look like?
A first project can be one process, such as the notification and status tracking for new charging devices and heat pumps. It would cover a form with mandatory fields and uploads, a status view for the customer or installer, an internal task list, and an export or interface into the system you already use. SolutionPlus runs small first projects as an MVP Sprint of 6 to 8 weeks with one price agreed before the build, scope and acceptance criteria written down, and a demo every week.
Smart meter and § 14a topics need more care. § 14a EnWG says that control must go through the smart meter gateway once a metering point has an intelligent metering system. That belongs to your metering partner and the certified gateway administration. A custom tool might display data or open tickets, but should not replace that chain.
How is a project estimated?
The public development hour at SolutionPlus is EUR 70 to 95. No project total is published, because the figure depends on scope. After a 30-minute call you receive a written estimate. For a process like the one above, the number of request types, the number of interfaces and the access rules for installers and staff move the estimate most. Questions about hosting location and data processing are agreed per project, and your data protection officer decides what is acceptable for your utility. Contract, IP and code ownership terms are agreed per project and written into the contract. Our contract checklist lists the clauses to look for, and the custom software vs off-the-shelf guide helps with the build or buy decision.
Where does a project like this start?
Pick one process that costs your team the most manual work, write down who is involved and which systems it touches, and ask your compliance team which rules apply. Then describe it to us. We work from Berlin, with further offices in the UAE and Pakistan, and our custom software development service covers this kind of build.
Describe your process through Send my request. Reply within one business day. If you want a first orientation, the project cost calculator shows the development hour and the kind of work involved.
Sources
All pages were opened on 11 November 2026. The law texts on gesetze-im-internet.de state no version date on the page.
- Bundesrepublik Deutschland, Energiewirtschaftsgesetz § 14a, Netzorientierte Steuerung von steuerbaren Verbrauchseinrichtungen: https://www.gesetze-im-internet.de/enwg_2005/__14a.html
- Bundesrepublik Deutschland, Energiewirtschaftsgesetz § 5c, IT-Sicherheit im Anlagen- und Netzbetrieb: https://www.gesetze-im-internet.de/enwg_2005/__5c.html
- Bundesrepublik Deutschland, Niederspannungsanschlussverordnung § 19: https://www.gesetze-im-internet.de/nav/__19.html
- Bundesrepublik Deutschland, Messstellenbetriebsgesetz § 29, Ausstattung von Messstellen mit intelligenten Messsystemen: https://www.gesetze-im-internet.de/messbg/__29.html
- Bundesrepublik Deutschland, Messstellenbetriebsgesetz § 30, Wirtschaftliche Vertretbarkeit der Ausstattung (consumption and capacity groups): https://www.gesetze-im-internet.de/messbg/__30.html
- Bundesrepublik Deutschland, Messstellenbetriebsgesetz § 45, Ausstattungsverpflichtungen des grundzuständigen Messstellenbetreibers (roll-out quotas): https://www.gesetze-im-internet.de/messbg/__45.html
- Bundesnetzagentur, Steuerbare Verbrauchseinrichtungen (decision BK6-22-300 of 27 November 2023): https://www.bundesnetzagentur.de/DE/Vportal/Energie/SteuerbareVBE/start.html
- Bundesnetzagentur, Roll-out intelligenter Messsysteme (updated 21 September 2026): https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/NetzzugangMesswesen/Mess-undZaehlwesen/iMSys/start.html
- Bundesnetzagentur, press release on the half-yearly metering survey (21 September 2026): https://www.bundesnetzagentur.de/SharedDocs/Pressemitteilungen/DE/2026/20260921_Rollout.html
- Bundesnetzagentur, Mitteilung Nr. 3 zur Festlegung BK6-21-282, Absicherung der elektronischen Marktkommunikation Strom (15 January 2024): https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2021/BK6-21-282/Mitteilung03/Mitteilung_Nr_3.html
Frequently asked questions
What is this article based on?
The public sources listed at the end: statutes, ordinances and Bundesnetzagentur publications. We do not cite a reference project from the energy sector here. SolutionPlus is a custom software and AI studio based in Berlin, with further offices in the UAE and Pakistan. This article summarizes what the sources require, so you can judge a first scope yourself.
Do we have to replace our billing or market communication system?
Not because of anything in this article. Market communication for electricity has had to run over the AS4 protocol since 1 April 2024, and a new tool should not reimplement that. A custom layer can sit beside it, for example a portal that collects structured requests and hands them to the systems you already use.
Which parts of this are legal advice?
None. The article cites the law and regulator pages as published and does not interpret them for your company. Whether a rule applies to your utility, and how, is decided by your own compliance team or counsel.
How is a project priced?
The public development hour is EUR 70 to 95, and no project total is published. After a 30-minute call you receive a written estimate for your scope. The main cost drivers are the number of request types and the number of interfaces to existing systems.